# Adding an Audit Plan

The Audit Planner breaks a working paper into stages, such as planning and fieldwork. Each stage has an estimated start date, a duration and the users working on it.

**Note:** **Applies to:** auditors who can edit the working paper. You need a working paper first. See [Creating a Working Paper](https://support.symbiant.co.uk/kb/creating-a-working-paper/).

## Opening the Audit Planner

1. Open the working paper and select the **Audit Planner** tab. The top of the tab shows the working paper's start date, stage and end date.

![The Audit Planner tab on a working paper](https://support.symbiant.co.uk/wp-content/uploads/2026/10/creating-an-audit-plan-01-tab.png)

## Adding a Plan

1. Click **Add Plan**.

![The Add Plan link on the Audit Planner tab](https://support.symbiant.co.uk/wp-content/uploads/2026/10/creating-an-audit-plan-02-add.png)

1. Choose the **Stage** you are planning. This is required.
2. Set the **Estimated Start Date** and **Estimated Duration (Days)**.
3. Choose the **Associated Users** who will work on this stage.

![A plan with Stage, Estimated Start Date and Duration, and Associated Users highlighted](https://support.symbiant.co.uk/wp-content/uploads/2026/10/creating-an-audit-plan-03-plan.png)

1. Click **Add Plan** again to add the next stage, with its own dates and users.

![Two plans added: Planning and Fieldwork](https://support.symbiant.co.uk/wp-content/uploads/2026/10/creating-an-audit-plan-04-plans.png)

## Removing a Plan

1. Click the **minus** icon at the top right of the Plan section.

![The minus icon at the top right of the Plan section](https://support.symbiant.co.uk/wp-content/uploads/2026/10/creating-an-audit-plan-05-minus.png)

1. A bin icon appears over each plan. Click the bin on the plan you want to remove.

![Bin icons shown over each plan](https://support.symbiant.co.uk/wp-content/uploads/2026/10/creating-an-audit-plan-06-bin.png)

## Saving

1. Click **Save** to save and close, or the pencil icon beside it to save and stay on the working paper.

![The Save and Save and Edit buttons at the top right](https://support.symbiant.co.uk/wp-content/uploads/2026/10/creating-an-audit-plan-07-save.png)

Once saved, each plan shows who created it and when.