---
title: Key Risk Indicators (KRIs)
description: "How to set up a Key Risk Indicator (KRI), link it to risks, collect values through a survey and see the result on the risk. Requires the Risk Register and Survey modules. **Applies to:** Administrators (set-up) and survey respondents ·…"
url: "https://support.symbiant.co.uk/kb/key-risk-indicators-kris/"
updated: "2026-10-30"
category: Risk Register Basics
tags:
  - Add
  - Scoring
  - "Surveys & Questionnaires"
  - Updating
  - User
  - Views
---

# Key Risk Indicators (KRIs)

How to set up a Key Risk Indicator (KRI), link it to risks, collect values through a survey and see the result on the risk. Requires the Risk Register and Survey modules.

**Applies to:** Administrators (set-up) and survey respondents · **Module:** Register Risks, Questionnaires and Survey

**Note:** This is an advanced function. If you need help, please submit a support ticket.

## How KRIs Work

A KRI is a measurable value, such as the number of security incidents in a month, that warns you when a risk is getting worse. In Symbiant a KRI is a survey question with a **KRI** response option. The option sets the thresholds that turn an answer green, amber or red. When the question is linked to a risk and answered in a survey, the colour shows on the risk.

Setting up a KRI takes five steps:

1. Set a KRI appetite on the risk category.
2. Create a KRI response option with thresholds.
3. Create a question and add the KRI option to it.
4. Link the question to the risks it measures.
5. Add the question to a questionnaire and answer it in a survey.

## Step 1: Set the KRI Appetite on a Category

Under **Register Risks** in the left-hand menu, select **Category** and open the category. Choose the **KRI Appetite Value**: the highest KRI colour you are willing to accept for risks in this category. Then select **Save**.

![Choosing a KRI appetite](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-01-category-appetite.png)

Every risk with this category inherits the appetite. The category list shows the KRI appetite for each category.

![KRI appetite in the category list](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-02-category-list.png)

## Step 2: Create a KRI Option

Under **Questionnaires** > **Questions**, select **Options**, then the plus icon at the top right.

![Options menu and plus icon](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-03-options-menu.png)

Set **Type** to **kri**.

![Choosing the kri type](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-04-type-kri.png)

Enter the **Response Guidance**, which shows under the question to tell people how to answer, and an **Option Description** so you can find the option later.

![Response guidance and description](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-05-guidance.png)

Under **Type Options**, enter the two **Threshold** values. In this example, below 3 is green, 3 or more is amber and 6 or more is red. Use the arrows button at the left of the bar to reverse the colours if a higher number is better. Set the **Minimum Value** and **Maximum Value** people can enter.

![Thresholds and limits](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-06-thresholds.png)

Select **Save** at the top right.

## Step 3: Create the Question

For more on options and questions, see [Creating a Question Option](https://support.symbiant.co.uk/kb/creating-a-question-option/) and [Creating a Question and Linking Options](https://support.symbiant.co.uk/kb/creating-a-question-and-linking-options/).

Select **Questions**, then the plus icon. Choose a **Type** and **Category** for the question and enter the **Question Text**, then select **Save**.

![A new KRI question](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-07-question.png)

On the saved question, select the link icon to the right of **Question Response Options**.

![Link icon for response options](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-08-link-option.png)

Select your KRI option and then the blue tick at the top right.

![Selecting the KRI option](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-09-select-option.png)

The option shows under the question. Select the pencil at the top right to save and stay on the question.

![KRI option linked to the question](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-10-option-linked.png)

## Step 4: Link the Question to Risks

A question with a KRI option has a **Linked Risks** tab. Select it, then the link icon at the top right.

![Linked Risks tab and link icon](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-11-linked-risks-tab.png)

Select the risks this KRI measures and then the blue tick.

![Selecting risks](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-12-select-risks.png)

Save the question. The linked risks show in the tab.

![Risks linked to the KRI question](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-13-risks-linked.png)

## Step 5: Collect KRI Values in a Survey

Add the question to a questionnaire, then create a survey from that questionnaire and assign it to the people who report the figure. See [Creating a Questionnaire](https://support.symbiant.co.uk/kb/creating-a-questionnaire-and-linking-questions/) and [Creating a Survey](https://support.symbiant.co.uk/kb/creating-a-survey/).

When someone answers the question, the response box turns green, amber or red based on the thresholds. See [Responding to a Survey](https://support.symbiant.co.uk/kb/responding-to-a-survey/).

![A KRI answer in a survey](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-14-response.png)

To collect the figure regularly, schedule the survey. See [Scheduling a Survey](https://support.symbiant.co.uk/kb/scheduling-a-survey/).

## Seeing the KRI on the Risk

Open a linked risk and select the **KRI data** tab. It lists each KRI question linked to the risk with its **Current**, **Last** and **Previous** results.

![The KRI data tab](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-15-kri-data.png)

The **KRI Details** section of the risk shows the overall Current, Last and Previous KRI, worked out from all the KRI questions on the risk and their question weightings (see [What are Question Weightings?](https://support.symbiant.co.uk/kb/what-are-question-weightings/)), next to the **Category KRI Appetite**. Here the current KRI is amber, which is within the amber appetite.

![KRI Details on the risk](https://support.symbiant.co.uk/wp-content/uploads/2026/10/key-risk-indicators-kris-16-kri-details.png)

**Tip:** The Risk Registers dashboard can be set up to show KRI information. If you would like this on your site, please submit a support ticket.

## Related articles

- [Managing Risk Categories](https://support.symbiant.co.uk/kb/managing-risk-categories/)
- [Creating a Survey](https://support.symbiant.co.uk/kb/creating-a-survey/)
- [Responding to a Survey](https://support.symbiant.co.uk/kb/responding-to-a-survey/)
- [Risk Appetite Logic](https://support.symbiant.co.uk/kb/risk-appetite-logic/)
