# Risk Bow Tie

How to build a risk bow tie: the causes on one side, the consequences on the other, and the controls in between. Requires the Controls module.

**Applies to:** Users who can edit the risk · **Module:** Register Risks and Controls

## How the Bow Tie Works

On a risk's **Controls** tab, **Likelihood Controls** are the preventive side of the bow tie: each has a **Root Cause** that the control stops. **Impact Controls** are the other side: each has a **Consequence** that the control limits if the risk happens.

## Linking Likelihood Controls

Open the risk and stay on the **Controls** tab. Select the link icon on **Likelihood Controls**, select the controls and select the blue tick. See [Attaching a Control to a Risk](https://support.symbiant.co.uk/kb/attaching-a-control-to-a-risk/) for the full steps.

![Link icon on Likelihood Controls](https://support.symbiant.co.uk/wp-content/uploads/2026/10/attaching-a-control-to-a-risk-03-link-icon.png)

## Linking Impact Controls

Select the link icon on **Impact Controls**.

![Link icon on Impact Controls](https://support.symbiant.co.uk/wp-content/uploads/2026/10/risk-bow-tie-03-impact-link.png)

Select the controls that limit the impact (use the search box to find them), then select the blue tick.

![Selecting an impact control](https://support.symbiant.co.uk/wp-content/uploads/2026/10/risk-bow-tie-04-select-impact-control-b.png)

## Adding a Root Cause

Select the pencil in the **Root Cause** column of a likelihood control and describe the cause the control prevents.

![Entering a root cause](https://support.symbiant.co.uk/wp-content/uploads/2026/10/risk-bow-tie-05-root-cause.png)

## Adding a Consequence

Select the pencil in the **Consequence** column of an impact control and describe what would happen if the risk occurred.

![Entering a consequence](https://support.symbiant.co.uk/wp-content/uploads/2026/10/risk-bow-tie-06-consequence.png)

The completed bow tie shows each likelihood control with its root cause on the left, and each impact control with its consequence on the right.

![Completed bow tie](https://support.symbiant.co.uk/wp-content/uploads/2026/10/risk-bow-tie-07-bow-tie-filled-b.png)

## Saving the Bow Tie

Select **Save** at the top right, or the pencil (**Save and edit**) to save and stay on the risk.

![Save buttons](https://support.symbiant.co.uk/wp-content/uploads/2026/10/risk-flows-05-save.png)

## Generating a Bow Tie Report

Select **Reports** in the left-hand menu, filter the **Module** to **Register Risks**, find the **Risk Control Bowtie Analysis** report and select **Generate**. When the Excel file opens, select **Enable Editing** so its formulas can run. See [Generating a Risk Register Report](https://support.symbiant.co.uk/kb/generating-a-risk-register-report/).

## Related articles

- [Attaching a Control to a Risk](https://support.symbiant.co.uk/kb/attaching-a-control-to-a-risk/)
- [Control Weightings](https://support.symbiant.co.uk/kb/control-weightings/)
- [Activating/Deactivating a Control](https://support.symbiant.co.uk/kb/activating-deactivating-a-control/)