Skip to content
Symbiant System Black Logo
  • Home
  • Knowledge Base
  • Symbiant Website
  • Symbiant Changelog
  • Submit a Ticket
  • My Support Tickets
  • Home
  • Knowledge Base
  • Symbiant Website
  • Symbiant Changelog
  • Submit a Ticket
  • My Support Tickets
Popular Keywords importuserdivisionsamlimport risk

Navigation & Accessibility

  • System Navigation Overview
  • Dashboard Layout Tools
  • Filtering Data
  • Advanced Filtering

User Basics

  • Adding a Record
  • Adding an Attachment
  • Editing a Record
  • Deleting a Record (Retractions)
  • Resetting your Password
  • Generating A Report
  • Filtering on Reports
  • Linking Records Between Modules
  • Unlinking Records from a Module
  • Reviews & Actions
  • Multi-Factor Authentication (Google Authenticator)

Risk Register Basics

  • Scoring a Risk (Inherent, Residual, Target & Appetite)
  • Risk Heat Map (Risk Matrix)
  • Risk Appetite Logic
  • Risk Score Aggregation
  • Risk Relations/Related Risks
  • Risk Flows
  • Risk Bow Tie
  • Key Risk Indicators (KRI’s)
  • Basel II and Sox Categories
  • Template Risks
  • Generating a Risk Register Report
  • Generating a Risk Aggregate Report

Control Basics

  • Adding a Control Policy
  • Attaching a Policy to a Control
  • Attaching a Control to a Risk
  • Control Weightings
  • Activating/Deactivating a Control
  • Control Assessments
  • Generating a Control Report

Workshop Basics

  • Creating a Workshop
  • Workshops Stages
  • Workshop Risk Treatment Plans
  • Workshop Escalating Risks to a Register

Incident Basics

  • Adding an Incident Contact
  • Creating an Incident
  • Linking Risks to Incidents
  • Linking Controls to Incidents
  • Generating an Incident Report

Survey & Questionnaire Basics

  • Creating a Survey
  • Scheduling a Survey
  • Responding to a Survey
  • Generating a Survey Report
  • Locking a Survey
  • Why can’t I see Questions in a Survey?
  • Questionnaire Basics
    • Creating a Questionnaire and Linking Questions
    • Questionnaire Question Visibility
    • Adding Questionnaire Pass and Fail Override Criteria
    • Question Basics
      • Creating a Question and Linking Options
      • Question Option Visibility
      • Adding Question Pass and Fail Override Criteria
      • Question Option Basics
        • Creating a Question Option
        • Adding Option Pass and Fail Criteria

Monitoring Action Tracker Basics

  • Creating an Action Tracker
  • Adding Tracker Findings
  • Approving and Validating Tracker Findings
  • Generating a Tracker Action Report

DPIA Basics

  • Creating a DPIA
  • Answering a DPIA Questionnaire
  • Adding DPIA Risks
  • Resetting a DPIA Questionnaire

Due Diligence Basics

  • Creating a Due Diligence
  • Adding Due Diligence Sections, Issues and Actions

Audit Basics

  • Creating an Audit Entity
  • Creating an Audit Issue Report
  • Creating an Audit Issue (Audit Tracker)
  • Adding Recommendations & Actions
  • Generating an Audit Issue Tracker Report

Working Paper Basics

  • Creating a Working Paper
  • Accessing Linked Records Inside a Working Paper
  • Adding an Audit Plan
  • Adding a Timesheet
  • Adding an Assessment (Surveys & Questionnaires)
  • Generating a Working Paper Report

SHE Basics

  • Creating a new SHE Entry
  • Attaching an Investigation to a SHE Incident
  • Creating a SHE Stop and Talk Entry
  • SHE Actions

Document Management Basics

  • Document Status Logic
  • Adding a Document Record
  • Document Approval Process
  • Document Change Request Process
  • Document Reviews

Symbiant AI

  • AI – Generating Ideas
  • AI – Record Fields
  • AI – Generating Dropdown Ideas
  • AI – Rewriting Content
  • AI – Finding Links
  • AI – Finding Similar

User FAQ

  • Login Issues
  • Why can’t I see Questions in a Survey?

Importing Data

  • Importing Data (Risk Register Specific)

System Errors & Issues

  • System Error Messages
  • Login Issues

System Setup

  • Multi-Factor Authentication (Google Authenticator)
  • Login Issues

Advanced System Functionality

  • Multi-Factor Authentication (Google Authenticator)

Admin FAQ

  • Login Issues

System FAQ

  • Login Issues

Account FAQ

  • Login Issues
View Categories
  • Home
  • Knowledge Base
  • User Information
  • Importing Data
  • Importing Data (Risk Register Specific)

Importing Data (Risk Register Specific)

How to import risk data from a CSV file into the System

Prepare Data for Import #

Ensure you have followed the Preparing Data for Import (Risks) steps and that your CSV file is formatted correctly against the rules and Register Risks Specific Rules,

Importing Data #

Navigate to the Risk Register module, select the three dots at the top right, and then Import

Select the file you wish to import data from,

Next, you will be shown the import screen, the column titles from the CSV will be present at the top (1), with import boxes below (2),

Important Note: To make the import process easier select the Translate option at the top right! (3)

From the drop-down select the Attribute that the column represents (In the above example Risk No. represents the Reference)

Importing Required Fields #

When importing data you must import at minimum the two system-required fields,

These are the Reference and Summary

It’s also recommended to Import any User defined required fields, (Denoted by a Red Asterisk on a form)

Risk Register / Drop Down Options #

It is highly recommended to import risks with a Register this ensures they aren’t just stored within the Risk Universe,

When importing a Risk Register or Drop Down Options to the system, ensure you select the drop-down attribute first (In this example Register) then select the value the column represents, so in this example Register Text

(This will import the value in the CSV file to the Register text value)

Note: If a Register OR Drop Down Option doesn’t exist when importing already, it will be created upon import.

Risk Score Set #

It is CRITICAL to import risks with a Risk Score Set this ensures scoring functionality immediately upon importing!

Your system will come with a default “Normal” score set, you can simply make every risk use this scoring set and then customise it once the import is complete,

When importing a Risk Score Set to the system, ensure you select the Risk Score Set attribute first, then select the Set Name,

Note: If importing a Risk Score Set that doesn’t already exist it will be created upon import. However, this New Risk Score Set will be blank and need configuring!

Risk Scores #

Importing Risk Scores with Risks is optional, you only need to import the Impact and Likelihood Scores, not the total, the system will do the calculations upon importing (Based on the Risk Score Set selected),

Ensure you select the base value as the type of score, Inherent or Residual, then select either Impact or Likelihood,

Saving an Import as a Preset #

If you want to import more than once, you can save the layout of the import into a Preset, Select the Star icon at the top right,

Select Save Preset,

Name the Preset and select Save,

Importing the Data #

After you have saved the preset, select Continue,

You will then be able to review the data that is being imported ensuring it is in the format you wish.

Critical Note: Ensure reference numbers are unique, any reference that already exists within your system will be overridden with the imported version if they share the same reference number!

Once you are satisfied with the data format, select Import,

The data will now be within the Register Risks Module.

Add, Import
Did this help?

Share This Article :

  • Facebook
  • X
  • LinkedIn
Require Additional Information? Please Contact Support

How can we help?

Updated on 17 January 2024
Importing Data (Risk Register Specific)Importing Data (Risk Register Specific)
Table of Contents
  • Prepare Data for Import
  • Importing Data
    • Importing Required Fields
    • Risk Register / Drop Down Options
    • Risk Score Set
    • Risk Scores
  • Saving an Import as a Preset
  • Importing the Data
Symbiant System White Logo

20-22 Wenlock Road

London

N1 7GU

Linkedin
Telephone Numbers
  • UK - 0113 5263 755
  • Support - 0204 5514 735 option 2
  • USA - 347 991 7130
Information
  • Home
  • Knowledge Base
  • Symbiant Website
  • Submit A Ticket
  • Change Requests
  • Support Staff Login

Copyright © 2025 Symbiant All Rights Reserved - Risk, Audit and Compliance Management Software

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies. However, you may visit "Cookie Settings" to provide a controlled consent.
Cookie SettingsAccept All
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
SAVE & ACCEPT
Loading...

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.